Day 239 - 30/6/14
A few more pics to update you where we are at.
Kitchen handles etc went in tonight, Bigpond Cable internet is now working in the house, and we have power in 1 room :)
We got out walk in robe completed by JustWardrobes. We love it!!!
Here is our current list of things to be done before handover.
Concrete/Render
- Render to concrete slag around entry way etc
- Render to area in washing line
Outdoor
- Dryer Duct to be cut through concrete above rear roller door and in laundry
- General painting like second story northern side etc
- Garage door PIN code entry to be installed
- Correct washing Line installed
- Paint rendered areas
Inside
- Plaster under stairs and whole room painted
- Skirtings etc around alfresco glass door
- Shelving in Walk in linen
- Shelving in Laundry
- General patching holes/paint like in front office, doors, behind toilets, air con vent front top bedroom
- General painting like laundry etc
Kitchen/Stone
- Painting/finishing in cavity under kitchen bench
- Hole cut in corner for power point on kitchen bench *to work out how we do that*
Windows/Doors
- The window in the dining needs replacing
- Missing door handles
- Doors replaced in Office/study *to work out how we do that*
- Cupboard doors for server room hit when opening/closing
- Windows replaced in Master room (awning), Ensuite (translucent), Bathroom lower (clear)
- Flyscreens main glass sliders
- Flyscreens too small in front office, upstairs front hallway
- Install flyscreens upstairs (including stair window)
Plumbing/Tiles
- Plumbing/bath/taps/toilets
- Shower rose in main bathroom (JOVIAN HAND SHOWER)