Day 201 - 23/5/14
A lot has happened in the last 19 days, and yet it feels like not much at all, as it happened so quick.
We now have all the stone benchtops installed everywhere. There were issues however... The laundry was cut wrong, the kitchen stove bench was cut wrong, the island bench had a chip in it and the kitchen sink stone was cut wrong. The taps in the ensuite didnt match up with the sinks in the stone, and the cabinets in the downstairs powder room didnt fit the sink's waste pipe.
Phew.
To everyone's credit, all has now been fixed!
A couple of other issues like the two office doors and some others being sent with the hinges on the wrong side, so they are getting new ones of those.
They also rendered the back of the garage without pulling through the dryer ducting. Oops.
A couple of other issues like the two office doors and some others being sent with the hinges on the wrong side, so they are getting new ones of those.
They also rendered the back of the garage without pulling through the dryer ducting. Oops.
We have garage doors. All the skirting and architraves are done in the house. The tiling has all been done everywhere, with just some grout to go.
But, only 4 weeks left until handover... skeptical, but they say its all still possible.
Painters start on Monday, and we may have a locked house come the end of the week! Exciting!
Finally a garage door!
And one at the back.
No stove cutout just yet.
There it is!
Island bench in kitchen
Bath all tiled
Main bathroom
Main bathroom
Upstairs powder room
Ensuite
Ensuite
Spare Bedroom (Overlooking the Krklec house!)
Sliding door between front offices and the living areas
Laundry sink in!
Window to the washing line for baskets etc
Kitchen sink bench in
Feels more like a house with a kitchen sink
Finished stone in the kitchen
Garage door down for the first time
Toilet downstairs
'Person' hole