Tuesday 25 February 2014

Day 114 - 25/2/14


I cant believe that is was a year ago today that we got our land contracts from FKP.  It feels like this has been going on forever!!  haha

Monday 24 February 2014

Day 113 - 24/2/14


We got through a monster lot of cabling over the last few days.  Hundreds of Cat 6 cables, twin & earth and other AV cables.






Friday 14 February 2014

Day 103 - 14/2/14


Glass... lots of glass.  All the windows were delivered, and the started putting them in today.  Very exciting!





Sunday 9 February 2014

Day 98 - 9/2/14


I think Emma and I have decided on our carpet today.



We are likely to go with the SmartStrand Silk Classic from Harvey Norman (the only suppliers).

http://www.harveynorman.com.au/smartstrand-silk-classic-carpet-flooring.html

This is some of the softest carpets, with the longest warranties going around.  It is not made of normal material, but partly from corn.

They say it comes with lifetime stain and soil resistance, making it incredibly easy to clean and maintain. Built-in stain and soil protection means that SmartStrand Silk Classic carpet does not require reapplications of protective cleaning products, helping to minimise chemicals in your home. It also helps to promote a hygienic and healthy environment.

Smartstrand Silk Classic carpet is made with renewably sourced polymer, derived from corn sugar and requires 30% less energy to manufacture.

http://forum.homeone.com.au/viewtopic.php?f=7&t=56280

Sure hope we are making the right decision.  *grin*

Friday 7 February 2014

Day 96 - 7/2/14


We have a roof!!!!  That's right, finally it feels like a real house with our Shale Grey Colorbond roof being installed today.

Gutters are all complete now, but we will have to have a gutter down the front wall of the house in the middle, as we can simply not put it anywhere else due to a bunch of issues.

Oh well.














Tuesday 4 February 2014

Day 93 - 4/2/14


Here is a short 50 second time lapse of the lower level of the house being built over a couple of month period.

https://www.youtube.com/watch?v=sp_jYm4Vngg&hd=1



Gutters and fascias are all going on today, and we have had to change out oven and stove, as Electrolux are not longer making the ones we were.  What a pain!!

Monday 3 February 2014

Day 92 - 3/2/14


Had our SS come onsite today and lookover the following issues:
  • Office window is too low for the desk we are installing, and they need to fix it
  • Look at the trusses for the aircon
  • Look at the projector lift install
  • Decided to re-do the master cavity slider to resolve the plasma mounting issues. 
All roof trusses are now on (Garage and alfresco were not on until today), except for a bit around the back that the truss guys forgot to make.  Oops.