Monday 30 June 2014

Day 239 - 30/6/14


A few more pics to update you where we are at.

Kitchen handles etc went in tonight, Bigpond Cable internet is now working in the house, and we have power in 1 room  :)

We got out walk in robe completed by JustWardrobes.  We love it!!!

Here is our current list of things to be done before handover.

Concrete/Render
  • Render to concrete slag around entry way etc
  • Render to area in washing line

Outdoor
  • Dryer Duct to be cut through concrete above rear roller door and in laundry
  • General painting like second story northern side etc
  • Garage door PIN code entry to be installed
  • Correct washing Line installed
  • Paint rendered areas

Inside
  • Plaster under stairs and whole room painted
  • Skirtings etc around alfresco glass door
  • Shelving in Walk in linen 
  • Shelving in Laundry
  • General patching holes/paint like in front office, doors, behind toilets, air con vent front top bedroom
  • General painting like laundry etc

Kitchen/Stone
  • Painting/finishing in cavity under kitchen bench
  • Hole cut in corner for power point on kitchen bench *to work out how we do that*

Windows/Doors
  • The window in the dining needs replacing
  • Missing door handles
  • Doors replaced in Office/study *to work out how we do that*
  • Cupboard doors for server room hit when opening/closing
  • Windows replaced in Master room (awning), Ensuite (translucent), Bathroom lower (clear)
  • Flyscreens main glass sliders
  • Flyscreens too small in front office, upstairs front hallway
  • Install flyscreens upstairs (including stair window)

Plumbing/Tiles
  • Plumbing/bath/taps/toilets
  • Shower rose in main bathroom (JOVIAN HAND SHOWER)